The flue gas purification project of the Hongmiaoling household waste incineration power generation project in Fuzhou City, Fujian Province, undertaken by Huaxing Oriental, has passed 72+24 hour trial operation
2023.05.22
The flue gas cleaning (FGC) project undertaken by Huaxing-east for Hongmiaoling waste incineration power plant in Fuzhou, Fujian passed 72+24 hours trial operation on April 29, 2021.
The plant has a processing capacity of 1200 t/d and is equipped with 2x600 t/d mechanical grate furnaces + 1x25 MW power generators. The FGC adopted the process of "SNCR + SDA + dry method + activated carbon injection + bag filter + SGH + SCR". It's an equipment supply project of Huaxing.
Huaxing-east's performance in Fujian Province includes Shishi in Quanzhou, southern Zhangzhou, Jinjiang in Quanzhou, Anxi in Quanzhou, Pujiangling in Zhangzhou, Jianyang in Nanping, northern Zhangzhou, Hongmiaoling in Fuzhou, Sanming Phase I and Phase II, Shanghang in Longyan, Xiapu in Ningde, and Changting in Longyan, etc.
Copyright ? 2021 Jiangsu Huaxing Dongfang Electric Power Environmental Protection Technology Co., Ltd. All Rights Reserved. 備案號(hào):蘇ICP備16018214號(hào)