EN
華星東方承建的山西省陽泉生活垃圾焚燒發(fā)電項(xiàng)目煙氣凈化工程通過72+24小時試運(yùn)行
2021.11.30

   我公司承建的山西省陽泉生活垃圾焚燒發(fā)電項(xiàng)目煙氣凈化工程于2021年7月1日通過72+24小時試運(yùn)行。


   The flue gas cleaning (FGC) project constructed by Huaxing East for Yangquan, Shanxi waste-to-energy plant passed 72+24 hours trial operation on July 1, 2021.



   該項(xiàng)目一期工程建設(shè)2×550t/d流化床生活垃圾焚燒爐+1×15MW汽輪發(fā)電機(jī)組,并預(yù)留1×550t/d流化床生活垃圾焚燒爐+1×15MW汽輪發(fā)電機(jī)組的擴(kuò)建余地。煙氣處理采用爐內(nèi)噴鈣+循環(huán)流化半干法+布袋除塵器+熟石灰粉輸送及儲存+活性炭儲存與噴射+工藝水系統(tǒng)+氣力輸灰+飛灰穩(wěn)定化工藝,為我司EPC工程。


   In the phase I project, two 550 t/d fluidized bed MSW incinerator  and one 15MW steam turbine will be established. Moreover, space for expansion of 1×550 t/d fluidized bed MSW incinerator and 1×15MW steam turbine will be reserved. FGC applied limestone powder injection + Circulating fluidized bed semi-dry method + bag house filter + hydrated lime powder conveying and storage + activated carbon storage and injection + process water system + pneumatic ash conveying + Fly ash stabilization . It is an EPC project of Huaxing East.





   華星東方在山西省的業(yè)績涵蓋包括:太原、晉中、陽泉、運(yùn)城、汾陽等多個項(xiàng)目。


 Huaxing East's achievements in Shanxi Province include: Taiyuan, Jinzhong,Yangquan,Yuncheng,Fenyang etc.